Moneytree Realty Logo

Connect With Us

Grow ur Money with Moneytree Realty

Green Line Metro in Mumbai—Metro

Green Line Metro in Mumbai—Metro Line 4, 4A, 10 and 11 Routes, Stations & Updates (2025)

Team MoneyTree
Posted on - 10 April, 2025

The construction progress for the Green Line Metro in Mumbai becomes visible through the development of Metro Lines 4, 4A, 10, and 11. The construction of Metro Line 4 approaches completion while the team anticipates the platform to start operations in mid-2025.

The Metro Lines 4, 4A, 10 and 11 are some of the features that make the Green Line Metro of Mumbai an important development in transportation. They work to provide better integration and tackle traffic problems in various regions of the city.

Introduction to the Green Line Metro

In total, the Green Line comprising of Metro Line 4, Metro Line 4A, Metro Line 10 and Metro Line 11, forms the three subdivisions of the Green Line Metro system in Mumbai.

As a future 2025 launch project, the Green Line Metro will drive both property development in nearby areas around its stations while providing sustainable urban transportation solutions.

Overview of Mumbai's Metro Expansion Plan 2025

Mumbai is developing Green Line Metro which consists of Metro Lines 4, 4A, 10, and 11. If commuted by these metro lines, traveling to and fro from work for millions of residents becomes easier so it helps to save time.

Metro Line 4

Metro Line 4 will extend from Wadala to Kasarvadavali and will serve Ghatkopar and Mulund which are crucial areas.

Metro Line 4A

Metro Line 4A will enhance the connectivity of Dahisar East with Kandarpada, which improves the circulation of the western suburbs.

Metro Line 10

Besides, Metro Line 10 will serve the travel between Ghatkopar and Mulund

Metro Line 11

Metro Line 11 will connect Mankhurd with BKC, which are significant commercial areas.

Significance for Commuters

The Green Line Metro of Mumbai is a key component for improving daily commutes.

Routes of the Green Line Metro

Metro Line

Stations

Line 4

Wadala, Ghatkopar, Kasarvadavali

Line 4A

Dahisar East, Kandarpada

Line 10

Ghatkopar, Mulund

Line 11

Mankhurd, BKC

Metro Line 4: Key Stations

The Green Line Metro’s line 4 in Mumbai runs from Wadala station to Kasarvadavali station. Some of the important stations are:

Metro Line 4A: Key Stations

The Dahisar East to Kandarpada segment operates as Metro Line 4A through the Green Line Metro system of Mumbai. Key stations include:

Metro Line 10: Coverage

Metro Line 11: Overview

The Green Line Metro of Mumbai, incorporating Metro Line 11, plans to come into service in 2025, changing the transport system of the city broadly. Metro Line 11 of the Green Line Metro in Mumbai runs from Mankhurd to BKC. This line is important for improving the connection between the major business centers and the residential suburbs. It will support the easy movement of commutation for numerous commuters who travel daily.

Mumbai Metro Construction Updates

The construction progress for the Green Line Metro in Mumbai becomes visible through the development of Metro Lines 4, 4A, 10, and 11. The construction of Metro Line 4 approaches completion while the team anticipates the platform to start operations in mid-2025. The current stage of completion for Metro Line 4A stands at 45% and officials predict the line will open for service during April 2025. The upcoming operational dates for Metro Lines 10 and 11 will provide residents with better urban connections throughout Mumbai.

Construction Progress of Lines 4 and 4A

Line

Current Status

Expected Operational Date

Line 4

49% Completed

Mid-2025

Line 4A

45% Completed

April-2025

Developments for Lines 10 and 11

Line

Stations

Current Status

Expected Operational Date

Line 10

4

Under Construction

2025

Line 11

10

Under Construction

2025

Expected Operational Dates

In the perspective of a thriving metropolis, Mumbai has a Metro Green Line Metro which is expected to improve the movement of people around the city quite significantly.

Connectivity and Impact

New urban transport infrastructure will transform the city with the introduction of Metro Lines 4, 4A, 10, and 11 for the Mumbai Metro Green Line. The new metro lines enhance city-wide commutes through superior area connectivity between essential districts and shorter journey times and allow populations better access to key facilities. A new infrastructure system will enable these regions to better join the existing economic transport networks of the city, leading to quicker commutation and elevated economic productivity in the area.

Boosting Connectivity in Mumbai

Benefits of Metro Line 3 for Mumbai Commuters

Real Estate Opportunities

The Green Line Metro in Mumbai is said to influence the construction of homes in its surrounding area. The regions around the lines will provide more supply for these types of businesses and will later be favorable towards Metro Lines 4, 4A, 10, and 11.

Environmental Considerations

The Mumbai Green Line Metro project focuses on urban ease of use by prioritizing sustainability goals. Urban expansion within the city demands right away by implementation of efficient transport systems that reduce so much pollution.

The metro project helps to create an environmentally-good public transit system while achieving a greener Mumbai.

Metro 3 Environmental Impact

Ecological Component

Impact

Improvement in Quality of Air

Lowering emission by vehicles

Traffic Volume Decrease

Reduce road congestion

Conservation of Biodiversity

Safeguarding parks and green areas

Metro 3 Sustainability

The Mumbai Green Line Metro conducts environmental initiatives that promote sustainability across both the construction period and normal operational day functions.

FAQs on the Green Line Metro

What is the Green Line Metro in Mumbai?

Urban development through the Green Line Metro serves as a primary transport program to enhance district integration within Mumbai. It includes Metro Lines 4, 4A, 10, and 11.

What is the route of Mumbai Metro Line 4?

Wadala at Metro Line 4 of Mumbai Metro extends its service to Kasarvadavali through a network of 30 stations with a total length of 32.32 kilometers.

What is Metro Line 4A?

Metro Line 4A extends the Green Line by serving Kasarvadavali to Gaimukh through two elevated stations.

What areas does Metro Line 10 cover?

The Metro Line 10 system links Gaimukh to Shivaji Chowk (Mira Road) through a transportation route of approximately 9.2 kilometers.

What is Metro Line 11 in Mumbai?

Line 11 of the Metro system at Wadala operates to Chhatrapati Shivaji Maharaj Terminus (CSMT) through 10 stations within a total distance of 12.744 km.

When will the Mumbai Metro Green Line be operational?

Green Line operation of the first section will start in 2025.

How will the Green Line Metro impact real estate in Mumbai?

Both real estate prices near metro stops and nearby business conditions will improve as a result of the new Green Line development.

What are the benefits of Metro Line 4 & 4A?

The new Metro Lines 4 and 4A system will create improved efficiency in transportation and shorter commutes as well as better connections for important areas in Mumbai.

Who is constructing the Mumbai Metro Green Line?

The Green Line development initiative belongs to the Mumbai Metropolitan Region Development Authority (MMRDA).

Where can I get real-time updates on Metro Line 4 & 4A?

Current information regarding metro development in Mumbai is displayed through both MMRDA's website and news platforms which monitor the progress of metro expansion.

Call us or

Fill the form below

+91
desktop cta image
mobile cta image

Property in India

Real Estate in India

Flats in Noida

Real Estate Developers in India